How can we help

We can find a solution for your needs

  • By clicking send you agree to Privacy Policy

  • This field is for validation purposes and should be left unchanged.
1300 669 036 Get in touch

The Smart Water People

water | wastewater | sewage

Enquire about Reverse Osmosis – Demineralised and Potable Water

Request a Quote

  • By clicking send you agree to Privacy Policy

  • This field is for validation purposes and should be left unchanged.

POTABLE AND DEMINERALISED WATER FOR GAS PLANT

Reverse Osmosis – Demineralised and Potable Water

Oil and Gas

Longford, Victoria

BACKGROUND

ExxonMobil’s site service upgrade to enable expansion at its Longford site required additional drinking water and demineralised water for boilers and chemical processes.  The Engineering, Procurement, Construction (EPC) contractor, CB&I, pre-selected MAK Water as a preferred supplier due to its experience supplying similar projects previously.

MAK Water became an integrated part of CB&I’s team in designing the project to meet ExxonMobil’s rigorous engineering standards and to ensure on-time delivery for this key part of the site infrastructure.

SOLUTION

Containerised demineralised (chlorides >2 mg/l and 0 mg/l hydrogen sulphide) plant and a bore water treatment plant providing potable water compliant to Australian Drinking Water Guidelines (ADWG).

Containerised Plants

  • By providing containerised plants MAK Water eliminated the need for expensive site labour
  • Plug and play operation when the container arrived on site enabled fast and simple commissioning
  • Design and construction was done in the MAK Water workshop which reduces construction risk

oil and gas engineering standards

  • ExxonMobil engineering standards were utilised
  • Hazardous area electrical and instrumentation supply
  • Manufacturers Data Report (MDR) and other vendor data requirements were included in the comprehensive operations manual

Local and remote support

  • Service and support were provided by the local
    MAK Water service office
  • Remote access for engineering and technical back-up

RESULTS AND BENEFITS

  • Design and Build. CB&I required a water treatment supplier to design and build water treatment plants to meet ExxonMobil’s requirements.
  • Oil and Gas standards employed. The plant conformed to Exxon Mobil’s rigorous design and documentation standards.