How can we help

We can find a solution for your needs

  • By clicking send you agree to Privacy Policy

  • This field is for validation purposes and should be left unchanged.
1300 669 036 Get in touch

The Smart Water People

water | wastewater | sewage

Found 49 Results

The Perth facility of a major national chicken processing & food manufacturing business was restricted from increasing production capacity due…

WASTEWATER RECYCLING FOR CHICKEN PROCESSOR

Dissolved Air Floatation (DAF), Dewatering Screw Press (DSP), Membrane Bioreactor (MBR), Reverse Osmosis (BWRO)

Food & Beverage

Perth, Western Australia

A Tier 1 mining company was set to construct a world class 500-room FIFO mining camp with resort-like rooms and…

POTABLE WATER AND SEWAGE TREATMENT FOR IRON ORE MINE CAMP

Brackish Water Reverse Osmosis (BWRO) and Membrane Bioreactor (MBR)

Mining

Pilbara, Western Australia

A major new meat processing facility was being developed for a regional town in South Australia. However, the existing STP…

DUAL WASTE TREATMENT PLANT FOR MEAT PROCESSOR

Membrane Bio Reactor (MBR), Screw Screen (SS)

Food & Beverage

Regional South Australia

A mining camp in a remote part of North Queensland was paying increasingly high costs for removal and disposal of…

Dewatering STP Sludge

Dewatering Screw Press (DSP) + Screw Conveyor (SC) + Polymer Preparation & Dosing (ASP)

Mining

North Quensland

A regional wastewater treatment plant was suffering problems with key equipment in their process train. Equipment was either operating inefficiently…

CLOTH MEDIA FILTER – EFFLUENT FILTRATION FOR ONSITE REUSE

Cloth Media Filter (CMF)

Municipal

Western Australia

A regional council in South East Queensland required replacement of the rotating biological contactors (RBCs) installed at their sewage treatment…

SEWAGE TREATMENT PLANT UPGRADE

Rotating Biological Contactor (RBC) and Screw Screen in Tank (SSB-mK)

Municipal

Imbil, Queensland

Sulphate of Potash (SOP) was identified by Geoscience Australia as a critical mineral for the country’s future; however, prior to…

REMOTE CAMP WATER AND WASTE WATER TREATMENT

Brackish Water Reverse Osmosis (BWRO) and Moving Bed Bioreactor Plus (MBBR+)

Mining

Goldfields, Western Australia

A remote natural gas, condensate and oil processing facility in north-west Western Australia had an ageing sewage treatment plant (STP)…

GAS PROCESSING HUB

Activated Sludge Bioreactor Plus and Dewatering Screw Press

Oil & Gas

Western Australia

The owner of a new iron ore mine in Yilgarn, Western Australia required water treatment facilities for potable water, sewage…

FULL WATER TREATMENT FACILITIES FOR IRON ORE MINE

SWRO, ASBR, OWS, SHDR

Mining

Goldfields-Esperance Region, Western Australia

An Australian mining company developing one of the world’s largest known copper and gold deposits needed a solution for sewage…

UNDERGROUND MINE

Membrane Bioreactor (MBR)

Mining

Mongolia

A mining camp in North Queensland needed to replace their existing sewage treatment plant as it was over 20 years…

SEWAGE TREATMENT FOR MINING CAMP

Moving Bed Bioreactor Plus (MBBR+)

Mining

North Queensland

A large correctional facility in Queensland was looking at options to reduce water consumption as a result of prolonged drought…

CORRECTIONAL FACILITY WATER RECYCLING

Membrane Bioreactor (MBR) and Brackish Water Reverse Osmosis (BWRO)

Infrastructure

Queensland

NEXT
Page 1 of 5