Background
A long-term service client reached out to MAK Water to conduct a review on the condition of their steel reaction tanks on site. During the review it was noticed that corrosion forming on the external panels of the tanks was causing a safety hazard and replacement was necessary.
MAK Water was selected to design, manufacture and install 3 x 240KL Steel rubber lined tanks on a live site where wastewater services had to remain operational.
Our service team worked closely with the client to implement a strategic waste removal plan while the plant was offline during demolition and construction of the new tanks.
Solution
Demolition and construction of new tanks on site.
MAK Water Key Solutions
- Fast turnaround, shut down to start up in three weeks
- Increased reliability of infrastructure
- Rebuild of external and internal components
- Custom decant lines manufactured and installed
- Better suited liners for wastewater application
- 12-hour hydrostatic test on each tank
- Onsite plant commissioning and operator training
- Ongoing service and maintenance contract
Results and benefits
- Compliance - Achieves better effluent quality with renewed decanting and sludge removal.
- Technical Support - Expert advice and consultation with all parties throughout the process and ongoing plant service and maintenance by MAK Water
- Safe working environment - Removed hazardous corroding tanks and replaced with ones that meet Australian standards
- Fast Delivery - Despite delays, the manufacturing process was fast tracked to achieve the required project timeline
- Increased optimisation and reliability - New tanks help ensure that the plant stays online.