How can we help

We can find a solution for your needs

  • By clicking send you agree to Privacy Policy

  • This field is for validation purposes and should be left unchanged.
1300 669 036 Get in touch

The Smart Water People

water | wastewater | sewage

Enquire about Gravity Clarification (GC) and Oil Water Separator (OWS)

Request a Quote

  • By clicking send you agree to Privacy Policy

  • This field is for validation purposes and should be left unchanged.

WASH BAY WASTEWATER RECYCLING FOR AIRPORT AIRCRAFT HANGAR

Gravity Clarification (GC) and Oil Water Separator (OWS)

Infrastructure

Brisbane, Queensland

BACKGROUND

The QANTAS terminal at Brisbane Airport required water treatment and recycling solutions for the treatment of water from wash down of aircraft and parts.

The waste water was to be treated and reused for wash down with excess water used for local irrigation.

SOLUTION

The solution was a gravity clarification system with an oil water separator. MAK Water (trading as Clearmake at the time) worked in partnership with QANTAS to design, manufacture and commission the water treatment and recycling equipment.

gravity clarification water Recycling System

  • Capable of treating up to 3,000L per hour of wash down water.
  • The system removes silt, oil, grease and heavy metals from the water. It then filters and disinfects the water to ensure it is safe for reuse for wash down or irrigation.

oil water separator

  • It was not practical to recycle water from some parts of the operation, so the water was treated using two Clearmake oil water separators designed for use in hazardous areas with intrinsically safe control systems before being discharged to the sewer system.

RESULTS AND BENEFITS

  • Maximum water efficiency. This combination of solutions cost effectively maximises water efficiency on the site.
  • Minimal trade waste discharge costs. The solution minimised trade waste discharge costs.
  • Environmental protection. The local storm water system and environment is protected from the pollutants generated on site during the wash down process.
  • Short-term payback. Pay back on this project was only 18 months.