SEWAGE TREATMENT FOR KAOLIN MINE

Activated Sludge Bioreactor (ASBR)

Mining

Goldfields-Esperance Region, Western Australia

BACKGROUND

The EPC contractor for Australia’s first dual open-cut kaolin mine and geological waste repository required a suitable sewage treatment plant to treat sewage from the accommodation camp and admin office.

MAK Water was selected to provide a complete design, manufacture, and installation package for the new sewage treatment plant.

MAK Water worked closely with the client to design a fit for purpose, long term solution that meets the required treated effluent quality.

SOLUTION

Modular Activated Sludge Bioreactor (ASBR) plant to treat 30 m3/day of domestic strength sewage to achieve Class C treated effluent.

 

MAK WATER KEY SOLUTIONS

  • Corrosion resistant fibre-reinforced plastic (FRP) bioreactor with internal plant room
  • Class C treated effluent for reuse in risk category low applications or for discharge to environment
  • Package includes: packaged sewage pump station, balance and treated effluent tanks, irrigation pump, supernatant sump, roofed bioreactor
  • Onsite installation, commissioning, and operator training
  • Ongoing service and maintenance contract

RESULTS AND BENEFITS

  • Safe, Compliant Effluent. Designed for the site-specific influent quality to meet the required Class C treated effluent quality
  • Technical Support. Expert advice and consultation with all parties throughout the process and ongoing plant service and maintenance by MAK Water
  • Turnkey Solution. Complete design, manufacture, and installation package
  • Fast Delivery. Despite client delays, the manufacturing process was fast tracked to achieve the required project timeline