Background
BHP Petroleum needed to secure their supply of potable and construction water. With no access to surface water and isolated from government supplied potable water, desalination was the best solution.
MAK Water worked closely with BHP Petroleum, their engineer, and the installation contractor, from concept to commissioning, providing the technical expertise to develop a turnkey solution to meet the project’s water treatment requirements.
Solution
MAK Water supplied a turnkey, Brackish Water Reverse Osmosis (BWRO) desalination plant.
MAK Water Key Solutions
REMOTE MONITORING
- Fully automated water treatment plant with remote monitoring and control
TURNKEY SOLUTION - Design, manufacturing, power supply site installation, commissioning, and service and maintenance.
- Balance of plant including water tanks and diesel generator
OPERATIONAL SUPPORT - Service and maintenance to ensure system reliability and peak performance, and maximisation of water quality to increase the life of the system.
- All technical support for maximum operational performance.
Results and benefits
- Safe, potable water. Programmable Logic Control (PLC) controlled sterilisation, with tank circulation and online free chlorine monitoring.
- Fully automated, reliable plant. Low level of operator intervention reduces client’s operating costs.
- Project compliance. MAK Water met the project specifications and vendor data requirements.
Up next