Background

A large mining company approached MAK Water as their mine site was plagued with ongoing issues surrounding unscreened wastewater entering their sewage treatment plant. Increased maintenance requirements and premature failure of downstream equipment motivated the mining company to reach out to MAK Water – The Smart Water People with a documented history of providing effective wastewater solutions.

MAK Water proposed a solution to screen the wastewater and effectively treat the source water by removing all solids less than 2mm eradicating equipment failure downstream and meeting the client’s key requirements of affordable, low maintenance and turnkey solution.

Solution

Supply and commissioning of a frame/skid mounted REKO Internally Fed Drum Screen, designed to treat 35m3/day of wastewater from a sewage feed source

MAK Water Key Solutions

  • Factory tested, Turnkey Package
  • MAK Water standard control system and instrument package
  • Onsite commissioning and operator training

Results and benefits

  • Turnkey solution. Complete design, manufacture and installation package.
  • Pre-tested, modular design. Plant was fully assembled and factory tested, and supplied with prefabricated interconnecting piping and cabling for easy site installation.
  • Safe, Compliant Effluent. Designed around the site specific influent quality to meet the required Class A+ treated effluent quality
  • Reliability. After installation the site engaged MAK Water to support the ongoing operation via a service agreement to ensure reliability and minimise local site operator involvement.